RENEWABLE ENERGY IN ESTONIA
RENEWABLE ENERGY POLICY IN ESTONIA
Energy Sector Development Plan
The new energy sector development plan (ENMAK) for the period up to 2035 was approved in early 2026. ENMAK aims to ensure energy security, boost national competitiveness, and facilitate the transition to a clean energy system. The plan’s ambition is to cover at least 80% of Estonia’s annual electricity consumption with clean energy and to achieve an average annual final electricity price for all consumer groups that is lower than in other Baltic Sea countries.
General Principles of Climate Policy
The General Principles of Climate Policy until 2050 were approved in 2017 and updated in 2023 according to Estonia’s long-term goal to achieve climate neutrality by 2050. The General Principles of Climate Policy is a vision document the principles and policy directions of which will be integrated into sectoral development plans in the future.
National Energy and Climate Plan
The Government submitted the National Energy and Climate Plan until 2030 to the European Commission in 2019. The plans are compiled by all EU member states on a uniform basis, and it describes the measures implemented in the member state to fulfil the goals of EU energy and climate policy. An updated plan was submitted to the European Commission in 2025.
Forestry Development Plan
The preparation of the Forestry Development Plan until 2030 was initiated in 2018, but it has not yet been completed. Among other things, the plan foresees the use of wood-based biomass for energy production. After the forest reform will enter into force, the Forestry Development Plan will be replaced by the General Principles of Forest Policy until 2050, and a new development plan will no longer be drawn up.
According to the existing National Spatial Plan until 2030, the unwanted impact of human activity on the climate must be avoided, a greater share of renewable energy in the energy supply must be achieved, energy-saving measures must be implemented and the environmental impact of energy production must be reduced. The plan recommends building renewable power plants in areas that have already been used for agriculture, industry or energy production and where there is a good electricity and road infrastructure.
In 2023, the Government initiated the preparation of a new National Spatial Plan until 2050, as the current plan until 2030 has already been largely implemented. In addition, the current plan does not address several current needs such as energy security and adaptation to climate change. The new plan addresses, among other things, the development of energy and gas infrastructure in relation to the development of human settlement. The national plan is also based on the current Estonian Maritime Spatial Plan.
Spatial planning of the marine area makes it possible to determine where and under what conditions various developments in the marine area are most appropriate. The plan determines, among other things, the areas suitable for wind energy development, the total area of which, including the innovation area and the reserve area, is 1783 km2, as well as the guidelines and conditions for wind energy development in these areas.
Gulf of Riga electricity connection plan
In 2022, the Government initiated the preparation of a National Designated Spatial Plan for Electricity Connections in the Gulf of Livonia. The purpose of the plan is to plan the electrical connections of the future offshore wind farm in the Gulf of Livonia, through which the electricity produced from wind at sea is brought to the main grid on land, from where it reaches consumers. An offshore wind farm is being developed in the Gulf of Livonia, consisting of 50 to 70 wind turbines with a total power of up to 1000 MW.
Nordic-Baltic hydrogen infrastructure in Estonia
In 2026, the Government initiated a national special spatial plan and a strategic environmental assessment (SEA) for the Estonian onshore section of the Nordic-Baltic hydrogen infrastructure, based on an application by the gas transmission grid operator Elering. The objective of the national special spatial plan is to design the Nordic-Baltic hydrogen corridor and the infrastructure required for its operation; this will help establish the technical and economic prerequisites for developing Estonia’s domestic hydrogen infrastructure and improve the region’s security of supply. Establishing a hydrogen infrastructure backbone enables the emergence of a liquid hydrogen market in Estonia and allows for more cost-effective operation and balancing of the domestic network. Branch connections can be linked to the backbone, extending to areas with hydrogen production or consumption potential.
Comprehensive and Designated Spatial Plans of Local Governments
The construction of objects with a significant spatial impact, such as wind farms, are generally foreseen in the Comprehensive Plans of local governments, on the basis of which Detailed Plans are drawn up or design conditions are issued. In the case when the construction of a wind farm is not planned in the Comprehensive Plan, a Designated Spatial Plan of the local government must be carried out.
Energy Sector Organization Act
The Energy Sector Organization Act stipulates the principles of promoting renewable energy and the requirements for improving energy efficiency by the public and private sector. By 2030, renewable energy will account for at least 65 per cent of gross domestic final consumption of energy. More specifically, renewable energy will account for at least 100 per cent of gross final consumption of electricity and for at least 63 per cent of gross final consumption of thermal energy.
The Electricity Market Act regulates the production, storage, transmission, sale, export, import and transit of electricity, as well as the economic and technical management of the electricity system. The law stipulates the principles of the operation of the electricity market based on the need to ensure efficient, reasonably priced electricity supply that meets environmental requirements and consumer needs.
The Grid Code lays down the technical requirements applicable to power-generating installations by virtue of the security of supply of the electricity system and simplified conditions for connection to the network of power-generating installations whose capacity is below 15 kW and which use a renewable source for generation.
The District Heating Act regulates activities related to the production, distribution and sale of heat in the district heating network and connection to the network in order to ensure efficient, reasonably priced heat supply that meets environmental requirements and consumer needs.
The Building Code applies to construction works, their design, building, use and maintenance in order to promote sustainable development and to ensure the safety, purposeful functionality and usability of the built environment. The Code also applies in the territorial sea.
Minimum Energy Efficiency Requirements for Buildings
The regulation establishes minimum requirements for the energy efficiency of buildings, including residential and non-residential buildings.
The Planning Act stipulates the principles of spatial planning and the requirements for the planning procedure and the implementation of plans in order to create the prerequisites of spatial development, land use, high-quality living and the built environment that takes into account the needs and interests of society. Environmentally friendly and energy-efficient solutions should be preferred when planning, and the use of renewable energy should be encouraged.
The Liquid Fuel Act stipulates the basis and procedure for handling liquid fuel for the purpose of collecting taxes and ensuring the quality of the most commonly used motor fuels, the obligation to register fuel containers, the requirements for the consumption of biofuel in transport, the organization of state supervision and liability for violations of the law.
Atmospheric Air Protection Act
The Atmospheric Air Protection Act stipulates measures to maintain and improve ambient air quality, requirements to protect the ozone layer, measures to mitigate climate change and reduce greenhouse gas emissions, organization of state supervision and liability for violations of the law.
Estonia has more than enough potential to meet domestic electricity and heat demand with domestic renewable energy production. In order to encourage the production and consumption of renewable energy, the state has regulated the payment of fees and subsidies for renewable energy.
Reverse auctions
Since 2018, the renewable energy subsidies are granted through reverse auctions. The purpose of the auctions is to find and support electricity producers from renewable energy sources at the cheapest price. The volume and announcement of tenders are determined according to the state’s renewable energy targets. The conditions for paying the renewable energy subsidy are regulated by § 59 of the Electricity Market Act. The renewable energy subsidy is paid out by the transmission grid operator Elering. To date, six auctions have been held; the first ones focused primarily on solar energy, while the most recent ones focused on wind energy. Read more about the reverse auctions.
Renewable energy fee
The payment of subsidies are financed by the renewable energy fee. The fee is collected from the final consumers of electricity in Estonia along with the eletricity bill and the grid service fee. According to the Electricity Market Act, the renewable energy fee is calculated by the transmission grid operator Elering and the amount of the fee for the following calendar year is published on Elering’s website every year on December 1. Read more about the renewable energy fee.
Other subsidies
According to need, have also been granted for the construction of a biomethane production unit, the construction of renewable energy storage equipment, the production of heat from renewable sources in the district heating network and the reconstruction of heat pipelines, the reconstruction of buildings and the installation of renewable electricity production equipment, the connection of renewable electricity production equipment to the electricity grid, the production and consumption of green hydrogen from renewable energy, the purchase of electric vehicles and the preparation of local government energy and climate plans. Read more on the website of the Enterprise and Innovation Foundation and the website of the Center for Environmental Investments.